Start a Project
Utility-scale solar array at golden hour
Solar EPC · Mission-Critical Construction · Site Evaluation

Resourceful energy. Real solutions.

Green Circuit is a construction management and development firm for energy and mission-critical infrastructure — from utility-scale solar fields to data centers — delivered with engineering discipline and genuine care for the land.

Talk to Us
$190MM+programs delivered
~60 MWsolar PV delivered / managed
14solar programs
5data centers built

What we do

Three disciplines, one standard: show up, measure everything, finish the punch list.

Solar field under construction

Solar Development & Construction Management

Design, development and CM for community and utility-scale solar: 14 programs, ~60 MW, $109MM in program value — plus a $50MM utility-scale wind program in North Dakota.

Data center infrastructure

Data Center & Mission-Critical Construction

Five data centers and two call centers delivered for names like United Health Care, Target, Pillsbury and Cray Research — $23.5MM of mission-critical builds plus $8MM in industrial and utility plants.

Site evaluation and engineering review

Site Evaluation & Feasibility

Due diligence for technology and redevelopment sites: electrical service and switchgear, mechanical and cooling plant, fiber connectivity, and records — before you commit capital.

Behind-the-meter community solar

Arrays built beside the buildings they serve — so every kilowatt produced offsets the residents' own electric consumption.

Community solar array beside a residential development

As construction manager we oversee design, engineering and installation of multi-megawatt arrays connected directly behind the meter for multi-family and mixed-use developments — working alongside property owners, master developers, energy advisors and legal counsel to bring each project from parcel to energization.

  • Stormwater catch basins joined by engineered creeks
  • Pollinator-friendly low-grow prairie planting — no mowing, real habitat
  • Underground feeders, screened equipment, natural visual buffers
  • Typical construction schedules of about 30 weeks
  • Fully demountable — designed to return to farmland or park at end of life

Renewable energy portfolio

Design, development and construction management across the Midwest and beyond.

ProgramRoleCapacityValue
Jefferson, WIDesign & Development20 MW$10MM
Statesboro, GAProgram5 MW$12.5MM
Shabbona, ILConstruction Management5 MW$10MM
Lena, ILConstruction Management5 MW$10MM
Pecatonica, ILConstruction Management5 MW$10MM
Rockford, ILProgram3.5 MW$14MM
CEI Chicago, ILDesign & CM2.5 MW$7.5MM
CEI Toledo, OHDesign & CM2.5 MW$7.5MM
Strawberry Point, IAProgram2.5 MW$7.5MM
Bloomer, WIProgram2.5 MW$7.5MM
DeKalb, ILProgram (ILSFA Community Solar)2.5 MW$6.3MM
St. Anne, ILConstruction Management2.5 MW$5MM
Rockford, IL RepowerProgram1.25 MW$625K
Hennepin County, MNProgram100 kW$1MM

Built where others would not: the Rockford array on the Kishwaukee River flood plain, Lena on embedded rock shelves at the edge of the driftless area, and DeKalb powering a 530-unit multi-family housing development.

Mission-critical track record

$23.5MM of data center and call center builds, delivered on schedule for owners who cannot tolerate downtime.

FacilityContract Value
United Health Care Data Center$4MM
Target Data Center$4MM
D.P.S. Data Center$4MM
Pillsbury Data Center$4MM
Cray Research Tech Center$3MM
United Health Call Center$2MM
MSP Parking Revenue Data Center$1.5MM
D.P.S. Call Center$1MM

Industrial & utility plants ($8MM+): Owens-Corning shingle plant ($2MM), PEC plastics plants ($5MM), and the Xcel Energy King Generating Plant expansion ($1MM).

Data center site evaluation. For owners and developers weighing a legacy facility or a new technology hub, we run the full due-diligence sweep: electrical service size and switchgear condition, one-line and riser diagrams, HVAC and central plant assessment, fiber routes and carrier presence, and complete records review — so the decision is made on evidence, not optimism.

Built with the land in mind

Every Green Circuit site is engineered to give back more than it takes.

Retention pond and creek management at a solar site

Water, managed

At DeKalb we rerouted the existing creek across the array, installed check dams to slow retention-pond overflow, and placed rip-rap to stop erosion.

Pollinator-friendly wildflowers under solar panels

Critter-friendly habitat

Pollinator-friendly, low-grow prairie plantings under and around our arrays — real ecological benefit for the project's whole lifetime.

Natural landscaping and erosion control at a solar array

Natural landscaping

No-mow ground cover means minimal upkeep, no chemicals, and sites designed to be demounted and returned to farmland or park.

Every project starts with a feasibility study

Technical and financial viability — assessed before construction begins.

Site assessment

Roof or ground condition, structure, shading, existing electrical capacity.

Energy demand

12–24 months of utility history; sizing and battery/peak-shaving assessment.

System design

Module, inverter and mounting specs; production modeling from local irradiance.

Economics

Install, permitting and O&M costs; ITC, rebates and incentives; ROI and payback.

Permitting

Zoning, codes, net metering rules and utility interconnection approval.

Stronger together: the Power Zone Solution partnership

Green Circuit works hand-in-hand with Power Zone Solution — the DeKalb, Illinois energy and infrastructure firm — on joint solar, data center and site-evaluation programs across the Midwest. Homeowners looking for rooftop solar and battery backup: visit InstallSolar.info. Businesses and developers: see commercial & community solar and the Illinois incentives guide.

Frequently asked questions

What does Green Circuit do?

Construction management and development for energy and mission-critical infrastructure: solar PV programs from feasibility through energization, data center and mission-critical construction, and site evaluation for technology and redevelopment projects — over $190MM delivered.

What solar projects have you delivered?

Fourteen programs totaling ~60 MW and $109MM in value across Illinois, Wisconsin, Iowa, Ohio, Georgia and Minnesota, plus a $50MM utility-scale wind program in North Dakota. See the portfolio table above.

Do you build data centers?

Yes — five delivered, including facilities for United Health Care, Target, Pillsbury and Cray Research, plus data center site evaluations covering electrical, mechanical, connectivity and records.

How do I start a project?

Email contact@green-circuit.com with your site or program — it reaches our whole team. Every engagement starts with an honest feasibility conversation.

Have a site, a program, or a facility in mind?

Resourceful energy, real solutions — and a straight answer on feasibility.

Email contact@green-circuit.com